clientContract ££3,600,000.00
pc date2017
|
Greenwich Peninsula M0104 was a 31 storey new build development carried out by Wates Construction on behalf of Knight Dragon.
The development consisted of more than 269 apartments of mixed tenure and had the inclusion of an underground car park with multi-story basement levels. Promech carried out the design and installation to the heating, domestic water and drainage system within the apartments. Promech also carried out a comprehensive sprinkler installation to serve the main tower block and apartments on the riverfront. The main tower block stairwell had a wet riser system installed; dry risers were installed in the remaining. |